Natural Stone Projects has sourced 4500m2 of cut to size external cladding in white limestone for the 2 acre super prime residential development, Campden Hill, Holland Park, London. The project was designed by architects John McAslan Partners for clients Native Land and Grosvenor and is set to become the leading super prime development of the future , http://www.mcaslan.co.uk/projects/campden-hill.
The white limestone bed was selected after confirming it met rigorous requirements in terms of performance data, visual appeal, budget, production time and quality control.
Natural Stone Projects brought security to the job by working directly with the quarry owner who owns 12 quarries, has a superbly equipped factory and specialises in external cladding in limestone. Further reassurance came from Peter Harrison of Harrison Goldman, an independent stone consultant who Natural Stone Projects introduced to the project. The Campden Hill development is scheduled for completion in 2016.
- Limestone blocks are cut into slabs
- Slabs imperfections are noted with the CNC tool to ensure they are avoided in the cutting process.
- Maintaining the production rate and quality control required
- Slab is marked out for cutting to meet quality control for external cladding
- CNC cut slabs. Any off-cuts that do not meet quality are recycled
- External cladding pieces cut, stacked and drying
- Checking the cutting list for external cladding
- Cut to size masonry for external cladding
- Inspection for quality control
- Each piece of limestone for external cladding is barcoded
- External cladding pre-drilled for mechanical fixing.
- Campden Hill, McAslan & Partners. External cladding sourced by Natural Stone Projects
Social Share
Natural Stone Projects has produced six made to measure carved basins in our Roman Silver Light vein cut travertine for…
Natural Stone Projects sourced this special selection of Branco Venatto marble to supply this bespoke bathroom designed by TG Studio…